Pesto Sutton Coldfield, Vietnamese Restaurant Berlin Mitte, What Happens If You Only Drink Diet Coke, Mirage Voice Actor Incredibles, Microsoft Dynamics Ax Tutorial Point, Market Segment Meaning, Kala Rang In English, Anthony Veneziale Speechless, Label The Layers Of The Earth Worksheet, Coffee Mate Natural Bliss Half And Half, Houses For Sale Moonee Ponds, Bob Fm Anchorage, Is George H Ross Still Alive, Chinese Communication Etiquette, Bisque Color Vs White, Orphan Of Kos Weakness, Spinach Ricotta Lasagna, Pomegranate Fruit Malayalam, Upside Down Jvke, Capstone Project Utd, Assassin's Creed Chronicles For Android, That 70s Song The Cab, Excel Formula For Lottery Combinations, Best Protein To Mix With Coffee, " />

riyadh metro line 3

IDOM has proposed that sustainability criteria permeate all the phases of the project, with the design of buildings with reduced energy and water consumption, the use of low environmental impact materials during construction, and materials which generate low maintenance costs. Pour les trois stations d'échange (Iconic Stations) un concours international d'architecture a permis de choisir trois projets[15] : Les lignes sont prévues pour fonctionner de façon complètement automatique. La dernière modification de cette page a été faite le 9 mars 2020 à 19:52. Les trains d'Alstom sont construits à Katowice en Pologne. Line 3 of the Riyadh Metro runs east-west along 41 km. Les rames, composés de 3 caisses toutes motrices, afin de pouvoir gravir des pentes de 60 ‰, seront divisés en 2 classes, mais la seconde classe comprendra des espaces distincts pour les familles et pour les hommes seuls[21],[22]. Sur une partie de son parcours, la ligne doit être doublée par une autoroute. Sa longueur sera de 25,3 km, comptera 13 stations et disposera de correspondances avec les lignes 1, 5 et 6. Le métro de Riyad est un système de transport en commun de type métro automatique actuellement en cours de construction destiné à desservir la ville de Riyad, capitale de l' Arabie saoudite. La Red Line parcourra un axe est-ouest le long de Al – Madinah Al Munawwarah Road et Prince Saad Bin Abdulrahman Al Awal Road, à partir de la voie express allant vers Jeddah à l'ouest et se terminant près du camp de la Garde nationale à Khashm El Aan. The correct coordination between the different disciplines is one of the project keys, a chore which has been eased by the multidisciplinary character of IDOM’s workforce, led from the capital of Saudi Arabia. … • Siemens is supplying 45 4-car Inspiro trainsets for Line 1 and 29 2-car sets for Line 2. The design strategy adopted to achieve savings in water consumption involves the correct treatment of grey water and its reuse for irrigation. Le 18 septembre 2018, est confirmé l'attribution du contrat d'exploitation et de maintenance des lignes 1 (bleue) et 2 (rouge) à RATP Dev en partenariat avec SAPTCO pour une durée de 12 ans[11],[12],[13]. Les lots sont alors attribués de la manière suivante : L'appel d'offres pour l'exploitation et la maintenance du futur métro de Riyad a été lancé par la Haute Commission au Développement de Riyad (High Commission for the Development of ArRiyadh, ADA) en mai 2015[8]. La longueur de la ligne sera d'environ 12,9 km et elle disposera de 10 stations, dont deux stations de correspondance avec les lignes 1 et 2. Le projet prévoit au total 6 lignes, 176 km de voies et 85 stations,. Siemens produira 74 rames de type Inspiro pour les lignes 1 (45 trains de quatre caisses) et 2 (29 de deux caisses). Sa longueur sera de 38 km, comptera 22 stations et disposera de 4 stations de correspondances avec les lignes 2, 3, 4, 5 et 6. La Purple Line sera une ligne semi-circulaire à partir de King Abdullah Financial District, en passant par l'Université islamique Imam Mohammed Ibn Saoud (en) et se terminant à Prince Saad Ibn Abdulrahman Al Awal Road. In terms of the workshops and depots, the design of the roof seeks to reduce direct solar radiation while maximizing the use of natural light. La Orange Line atteint l'aéroport international du roi Khaled depuis le King Abdullah Financial District. Consortium Capital Metro Company (Camco) regroupant, Eisenbahn-Revue International 10/2013, page 519, Université islamique Imam Mohammed Ibn Saoud, Le projet sur le site Snohetta et Gerber Architekten, https://fr.wikipedia.org/w/index.php?title=Métro_de_Riyad&oldid=168266111, Article contenant un appel à traduction en anglais, Article avec une section vide ou incomplète, Catégorie Commons avec lien local identique sur Wikidata, Portail:Transports en commun/Articles liés, licence Creative Commons attribution, partage dans les mêmes conditions, comment citer les auteurs et mentionner la licence, Abdul Rahman bin Ouf Road - Sheikh Hassan bin Hussein Road, Les lignes 1 et 2 sont confiées au consortium BACS regroupant, La ligne 3 est confiée au consortium ANM regroupant, Les lignes 4, 5 et 6 sont confiées au consortium FAST regroupant. Riyadh metro network consists of 6 lines For Example Line 2 the Red Line (King Abdullah Road) is 25.3 KM long. Al-Faisal University Visit March 21, 2019; MONTHLY HSSE AUDIT REPORT – January 2019 March 3, 2019; Stations January 17, 2019; ADA’s top management Visit June 3, 2018; WORLD DAY FOR SAFETY 2018 May 27, 2018; Achievements. Les lignes 3 (orange), 4 (jaune), 5 (verte) et 6 (violette) seront exploitées et maintenues par le consortium FLOW regroupant Ferrovie dello Stato Italiane, Alstom et Ansaldo STS[13]. La longueur de la ligne sera d'environ 40,7 km et disposera de 20 stations, dont deux stations de correspondances avec les lignes 1 et 6. Sa mise en service est prévue pour 2020[4]. Les autorités ont décidé de mettre en œuvre le projet en confiant la construction et l'équipement, c'est-à-dire la fourniture des trains et systèmes de signalisation, à des groupements d'entreprises, en structurant des appels d'offres par lots de ligne. Ce programme vise à mettre à disposition de toutes les groupes de population et service de transport en commun adapté, réduire l'utilisation de la voiture individuelle au stricte minimum, permettre le futur développement de la ville et produire des effets positifs sur la circulation, l'économie, la société et l'environnement de la capitale[3]. Plus, the consortium was the selected tenderer for the works of Line 3, over 41 km long, IDOM being responsible for its entire design: route, tunnel, viaducts and level sections, along with the stations (underground and over-ground, as well as the connection stations with Line 6), workshops, sheds and the road and landscape works necessary for its blending in with the urban environment. Line 3 (Orange Line) runs in the east-west direction along Al–Madinah Al Munawwarah and Prince Saad Bin Abdulrahman Al Awal Roads, starting at the west near Jeddah Expressway and ending at the east near the National Guard camp of Khashm El Aan. Le métro de Riyad est un système de transport en commun de type métro automatique actuellement en cours de construction destiné à desservir la ville de Riyad, capitale de l'Arabie saoudite. La Blue Line construite sur un axe nord-sud, à partir de la Prince Salman Bin Abdul Aziz Street au nord et se terminant dans la banlieue de Dar Al Badia au sud, elle traversera le quartier d'Olaya et Batha streets. La Yellow Line sera une ligne souterraine forée le long de King Abdulaziz Street, entre le Abdul Aziz Historical Centre et la base aérienne de Riyad, avant de connecter avec la King Abdullah Road. Riyadh Metro has 6 Lines divided into: (Blue Line) Olaya – Batha’a with 38 KM distance. Given the extreme climatic conditions in Riyadh –subtropical hot desert climate, high solar radiation and temperatures that can reach 50ºC–, the main strategy has been to reduce consumption with the architectural design, producing buildings with an envelope based on bioclimatic concepts. La ligne 3 sera équipée de rames par Ansaldo STS/Bombardier et les lignes 4, 5 et 6 de métros livrés par Alstom[20]. Bombardier livrera 47 trains de 2 caisses de type Innovia 300 pour la ligne 3[19]. Hitachi-Ansaldo STS, Keolis, MTR (métro de Hong Kong), RATP Dev et Serco (exploitant-mainteneur du métro de Dubaï) ont candidatés[9],[10]. Ces derniers ont une structure en aluminium et peuvent rouler jusqu'à 90 km/h. La longueur de la ligne sera d'environ 29,9 km et elle disposera de 8 stations (dont 3 seront communes avec la ligne 4), tandis qu'elle possèdera 3 autres stations de correspondance avec les lignes 1, 2 et 3. La longueur de la ligne sera d'environ 29,6 km qui sera essentiellement aérienne, il disposera de 8 stations (dont 3 seront communes avec la ligne 6), en plus d'une station de correspondance avec la ligne 1. Le projet est supervisé par la High Commission for the Development of ArRiyadh (ADA). Elle sera essentiellement une ligne aérienne sauf le long de Sheikh Hasan Bin Hussein Bin Ali Street. IDOM has participated in the design of the entire infrastructure during the tendering process, as part of the consortium led by Salini-Impregilo, has carried out the detailed design. Also within IDOM’s scope of work is the urban repositioning of the areas affected by the metro. CLIENT: Royal Commission for Riyadh City (RCRC). The first was unveiled in Vienna on 23 February 2016. IDOM is designing practically all the infrastructure: all the works of the line, the stations –including the transfer station with Line 6– the workshops and depots at either end of the line. Conséquence de l'attribution de la conception et de la construction du métro de Riyad en trois grands lots, les lignes 1 et 2 seront équipées de trains Siemens, Le 23 février les premiers trains de Siemens ont été finis à Vienne[19]. While the stations are based on a predefined design, IDOM has had great freedom to develop the work on many levels: from the shading of the buildings to the design of a high performance envelope or optimizing the installation of solar panels, air-conditioning systems and energy–efficient lighting. This has been achieved by introducing north-facing skylights, while at the same time optimizing the positioning of photovoltaic panels to generate some 45% of the electricity consumed by the fixed equipment of the building. En décembre 2011, les autorités approuvent un vaste programme prévoyant la création, ex-nihilo, d'un réseau de transport public d'envergure mondiale autour de six lignes de métro et un réseau d'autobus[3]. Un article de Wikipédia, l'encyclopédie libre. Il se peut que ces informations soient de nature spéculative et que leur teneur change considérablement alors que les évènements approchent.

Pesto Sutton Coldfield, Vietnamese Restaurant Berlin Mitte, What Happens If You Only Drink Diet Coke, Mirage Voice Actor Incredibles, Microsoft Dynamics Ax Tutorial Point, Market Segment Meaning, Kala Rang In English, Anthony Veneziale Speechless, Label The Layers Of The Earth Worksheet, Coffee Mate Natural Bliss Half And Half, Houses For Sale Moonee Ponds, Bob Fm Anchorage, Is George H Ross Still Alive, Chinese Communication Etiquette, Bisque Color Vs White, Orphan Of Kos Weakness, Spinach Ricotta Lasagna, Pomegranate Fruit Malayalam, Upside Down Jvke, Capstone Project Utd, Assassin's Creed Chronicles For Android, That 70s Song The Cab, Excel Formula For Lottery Combinations, Best Protein To Mix With Coffee,

No Comments Yet.

Leave a comment

error: Content is protected !!